How to specify a pool safety fence

What to decide and when: barrier strategy, the fence line, levels and drainage, and the full preparation data for a retractable pool fence, trade by trade.

Updated 5 min read

A pool barrier costs least when it is drawn at concept stage and most when it is added at handover. By then the paving is laid, the levels are fixed and the only fence that fits is the one nobody wanted. This guide sets out what to decide early, and gives the preparation data for a retractable fence so that it can be written into the drawings.

Illustration: a pool terrace plan on an architect's desk
Illustration: a pool terrace plan on an architect's desk

Five decisions for the concept stage

  1. Which rules apply. Identify the authority, the code and its edition. If you intend to use a retractable or automatic barrier, ask in writing whether it is accepted as the required barrier. The regulations page summarises the main markets.
  2. Isolation or perimeter. A barrier that separates the pool from the house protects children better than a fence around the plot, and some codes require it. It also decides where the line runs.
  3. Where the line runs. Set it back from the water, on straight runs, clear of the main sightline and on the paving grid.
  4. Which barrier on which side. A boundary wall, a glass screen on the windward side and a retractable fence towards the house can form one continuous perimeter.
  5. Where people enter. The gate belongs on the route people naturally take, visible from the house, and to one side of the principal view.

Setting out the line

Work in straight runs. Smart Fence units are made to measure, up to 3.99 m long, and a unit cannot turn a corner. Each straight run is divided into equal units, so runs can be any length, and they meet at corners.

Relate the module to the paving. A run that starts and ends on a paving joint looks designed. The units of a run are made to its length, so no odd piece is left at the end: the joints between units divide the run equally.

Leave a walkway. About one metre between the fence and the water gives room to walk around the pool and to reach a swimmer.

Keep the line level. Where the terrace steps, end one run and start another.

Coordinate below ground. The concrete base is at least 70 cm wide and its top lies 30 to 35 cm below the paving; the dig goes deeper, by the thickness of that concrete. Check it against the pool shell, the pipework around the pool, any balance tank and the structural joints in the slab.

What sits under the floor
Section through the channel A cross-section: the unit box sits in a concrete channel 30 to 35 cm below the paving and at least 70 cm wide. The handrail lies level with the paving. A 50 mm drain and a control cable lead away from the box. Pool Handrail, level with the paving Paving Unit box Concrete base 30–35 cm min. 70 cm Drain, Ø 50 mm 9 × 1.5 mm² cable
  • 30 to 35 cmConcrete base, below the paving
  • 70 cmChannel width, at least
  • Up to 4 mUnit length, made to measure
  • 1 dayTypical installation, up to 8 units

Preparation data for a retractable fence

Item Requirement
Raised height1,250 mm
Mesh opening40 mm
Unit lengthMade to measure, up to 3.99 m; each straight run is divided into equal units, and a unit cannot turn a corner
ChannelA concrete base recessed 30 to 35 cm below the paving line, at least 70 cm wide
FixingEach unit box anchored to the concrete on four feet and levelled to the finished floor
DrainageA collection point for the unit boxes, connected to the drain or a soakaway by a 50 mm pipe
PowerA supply point for the controller in a dry location, not the plant room; 3 × 2.5 mm² cable
Cables to the units9 × 1.5 mm², one dedicated cable from the controller to each unit; a two-core cable to the gate unit
ControlsHandheld remote, app, or home automation through four dry contacts
LightingLED strip in the handrail; flashes while the fence moves, or stays on as accent lighting
Handrail finishBlack aluminium cover, or a 1 cm tile or decking inlay to match the floor
GateAny unit; opened at a concealed button in the handrail; closes by itself after about 20 seconds

These figures come from the manufacturer's documentation. The project drawings we issue confirm every dimension for your site.

Who does what

Trade Scope
ContractorPrepares the concrete channel; brings the floor finish up to the handrail on both sides
PlumberConnects the drainage of the units to the drain or a soakaway with a 50 mm pipe
ElectricianProvides the supply to the controller and runs a 9 × 1.5 mm² cable from the controller to each unit, and a two-core cable to the gate unit
Smart Fence teamTechnical drawings; setting, anchoring and levelling each unit; wiring inside each box; commissioning; testing; handover
Installation in four stages
  1. 1Site preparation

    A perimeter channel with power and drainage points, prepared to our drawings.

  2. 2System installation

    Modular units are placed, anchored to the concrete and levelled.

  3. 3Connection and setup

    Drainage and control cables are connected and the system is commissioned.

  4. 4Testing and handover

    A full operating test, a briefing for you and the documentation.

Where it sits in the programme

  1. Design. Site survey, layout and preparation drawings.
  2. Structure. The channel is cast with the terrace slab, or cut at paving level on an existing pool.
  3. First fix. Drain connection, power point and control cables.
  4. Installation. Units set, anchored and levelled. A typical pool, up to eight units, takes about one working day.
  5. Commissioning. Each box is wired and the system is started.
  6. Finishes. The paving or decking is brought to the handrail, and the inlay is fitted.
  7. Handover. A full function test, a walkthrough with the client and the documentation.

The step-by-step version for clients is in the installation guide.

The compliance file

Collect these as the project goes, not at the end:

  • the authority's written position on the barrier type
  • the layout and preparation drawings
  • the product data: height, mesh, gate operation
  • the commissioning and test record
  • the client walkthrough and the operating instructions

Requirements differ by jurisdiction, and in some markets a pool barrier is a condition of the completion certificate. Compliance is always confirmed against the local code and the conditions of the project.

Six mistakes we see

  1. Deciding after the paving is ordered. A matched handrail needs the same tile, from the same batch.
  2. Forgetting the drain. The unit boxes need somewhere for rain and splash water to go.
  3. Putting the controller in the plant room. It belongs in a dry location.
  4. Runs that ignore the paving grid. The fence line then cuts across every joint.
  5. A gate on the main axis. The one unit that moves most often ends up in the middle of the view.
  6. Treating the barrier as the whole answer. It is one layer of protection, and the client should hear that at handover.
A hillside villa and its raised pool seen from the air
A hillside villa and its raised pool seen from the air

Getting the drawings

Send us the pool plan and the terrace levels through the contact page, or sketch the layout in the configurator and submit it. We reply with a layout, the number of units and the preparation drawings for your contractor. Finished projects are on the projects page.

A pool terrace with the Smart Fence retractable pool fence raised along the water

See it in your space

Whether your pool is built or still on the drawing board, we will help you plan a Smart Fence around it.